Magnolia Park in Wrocław will save over 185 000 € over 5 years, thanks to the modernization of lighting to LED and the implementation of a zonal wireless control system.

At Magnolia Park in Wrocław, we completed one of the largest outdoor lighting control projects in Poland, and possibly even in Europe. The project involved the replacement of LED fixtures in the external parking lot, park surroundings, and the illumination of the building’s facade. A total of 396 new-generation LED fixtures were installed, which are wirelessly managed via a mobile device using an innovative zonal system, where four fixtures are controlled by a single controller.

Client

Magnolia Park Wrocław

Type of Investment

External parking, park surroundings, facade illumination

Industry

Commercial property

Specifics

Warm color temperature of 3000 K

Challenges

Wireless zonal control via a mobile device

Lack of documentation, need for precise inventory

Product Customization

Customization of fixture’s: color, optics, and installation method

Synchronization of renovation stages with fixture deliveries

The client expressed three main needs: the need for savings, the addition of a zonal lighting management system, and the improvement of the quality and aesthetics of the property.

The expectations included:

Key challenges included the lack of lighting documentation, the need for precise inventory, customization of fixture color and optics, and staged installation according to the client’s capabilities.

One of the important aspects for the client was selecting lighting fixtures that fit into the existing infrastructure and surroundings of Magnolia Park, as well as adjusting the color temperature to match the already existing illumination.
Marcin Oleszowski

Street Investment Manager, Luxon LED

Lighting concept

As part of the lighting modernization at Magnolia Park, we decided to use three types of LED fixtures tailored to the specific needs of this property. For the lower poles lighting the internal roads, we implemented the Cordoba LED S fixtures, which ensure optimal light distribution and energy efficiency. For illuminating large areas and bypass roads, we installed the M and L models on higher poles, which are excellent for lighting wide spaces.

The illumination of the facade and the parking area near Castorama was provided by Skylight LED fixtures, which allow for the adjustment of light distribution according to needs—focusing on selected architectural elements or evenly lighting the parking surroundings, where effective illumination of a large area was required with lower poles.

The fixtures were grouped in a control system, allowing for easy management of light intensity and grouping through a free app. The Casambi control system enables full lighting control without any additional usage fees.

Cordoba LED L i L

Used for illuminating large areas and bypass roads on high poles. Thanks to advanced optics, it provides even lighting over long distances, making it ideal for areas with high traffic intensity.

Skylight LED

The floodlights for the facade and parking area near Castorama allow for adjusting light distribution to various needs – from focused illumination of objects to even lighting of large open spaces.

Madrid LED

This fixture combines aesthetics with energy efficiency, creating a friendly and comfortable atmosphere in the space.

Scope of cooperation

Inventory
Audit
Design
Luminaires supply
Control
Installation

We began our collaboration with a thorough inventory and audit of the existing lighting, which allowed us to identify all aspects requiring modernization. The audit revealed that the installation was in good condition and that the lighting design was well-optimized. As a result, the modernization could take place in a 1:1 replacement system, meaning that each old fixture was replaced with a new LED fixture. After completing the audit, our R&D department began customizing the lighting fixtures, adapting the products in terms of installation method, lens selection, and light color. We paid special attention to the illumination of the building’s facade, where custom solutions were required to maintain the existing warm color effect.

In the external parking area, we used fixtures from the Cordoba LED family: Cordoba S for lighting the internal roads on low poles, while for the access roads and large parking areas, we chose the M and L models. The illumination of the facade and selected areas of the parking lot was provided by Skylight LED fixtures, while the park surroundings were lit with Madrid LED fixtures. A key element of the modernization was the implementation of the Casambi wireless control system, which allows for lighting management from mobile devices. The installation took place in stages to accommodate the client’s capabilities and the ongoing renovation of the property. Thanks to our flexible approach and close cooperation with the client, we successfully carried out the entire modernization process while minimizing disruptions to the shopping center’s operations.

Implementation results

72%

annual energy savings

<3 years

return on investment period

185 000 €

savings amount over the 5-year warranty period

We replaced fixtures that were sodium lamps with a power of about 300 watts per fixture. The savings were calculated before the investment to determine the return on investment period. This resulted in savings of around 70%.
Tomasz Gorczowski

SELTOM CEO

Get support from our experts

Provide your contact details. We will contact you within 24 hours on business days

ASK ABOUT A PRODUCT
ASK ABOUT OFFER

Are you looking for an investment product? Need help choosing luminaires for challenging conditions? Leave your contact details, and we will get in touch within 24 hours on business days

Maximum file size: 16.78MB

If your attachment is larger than 100MB, include a link to download the file in the message.
Consent

Do you have a specific project? Need an offer? We will prepare it for you! Simply send us the specification, details, and expected implementation date.

Maximum file size: 16.78MB

If your attachment is larger than 100MB, include a link to download the file in the message.
Consent

View Other Case Studies

See all